10 October 2006

Modular Theatre Relocated in Six Weeks!!

At the end of October ModuleCo (formerly PKL Healthcare) will be permanently relocating an operating theatre suite to it's new home at Halton Hospital in Runcorn. As part of a 'spend to save' scheme, North Cheshire Hospitals NHS Trust are reconfiguring the services of their two hospital sites. The modular operating theatre with 2-bed recovery is the first step in this reconfiguration and will be ready to receive it's first patient on the 4th December.

The total programme for re-installation is only six weeks, which includes some changes the layout and the creation of an extra
modular building link. This short programme is made possible due to the modular design of the theatre suite. The features of which include, a fully enclosed and fitted out plant room module, breakable service connections on module joints (where allowed), and rooms that are contained within single modules are completely fitted out before delivery.

ModuleCo have now provided over 65 dedicated healthcare facilities for a range of requirements on a temporary and permanent basis.

No comments: